Gully Inspection Process

From In Touch Ltd
Jump to: navigation, search

Gully Inspection Process - **Page Under Construction**

  • Construction type
  • Construction depth – i.e. 950mm from cover to internal gully base
  • Outlet depth - for top of cover to top of outlet
  • Outlet depth - for top of cover to bottom of outlet
  • Silt level
  • Condition
  • Running/non running
  • Faults on Gully
  • Third Part pollution